Problem

As part of a preliminary design, estimate the required blower power for the complete-mix...

As part of a preliminary design, estimate the required blower power for the complete-mix BOD removal and nitrification stage for Pekin’s new BPR wastewater treatment plant ( Problem 16-51 ). The following estimates have been provided for the design of one of eight basins:

Problem 16-51

Your firm has been asked do a preliminary study of the feasibility of a new A2/O BPR wastewater treatment plant for Pekin. Begin the design of the complete-mix BOD removal and nitrification stage for the plant. As a first step determine the SRT and volume of tank required for nitrification using the following design data:

Step-by-Step Solution

Request Professional Solution

Request Solution!

We need at least 10 more requests to produce the solution.

0 / 10 have requested this problem solution

The more requests, the faster the answer.

Request! (Login Required)


All students who have requested the solution will be notified once they are available.
Add your Solution
Textbook Solutions and Answers Search