Solution: | ||||||||
Hours Worked | Extra hours Worked | Time Saved | Working days | Basic pay | Overtime Payment | Bounus | Total Wages | |
Arifah | 160 | 16 | 20 | 400 | 20 | 420 | ||
(640 x 15 / 60) | (22 - 1 - 1) | (16/2)*2.5 | ||||||
Atiah | 180 | 4 | 18 | 360 | 12.5 | 372.5 | ||
(900 x 12 / 60) | (22 - 1 - 3) | (RM2.5*1.25)*4 hours | ||||||
Afifah | 150 | 26 | 17 | 340 | 32.5 | 372.5 | ||
(900 x 10 / 60) | (22 - 1 - 4) | (26/2)*2.5 | ||||||
Total | 1100 | 12.5 | 52.5 | 1165 | ||||
Note: | ||||||||
1) Standard rate per hour = RM20 / (176hours / 22days) = RM 2.5 | ||||||||
2) According to Halsey plan, Bonus = 50% of time saved x Basic rate per hour | ||||||||
3) Labor day Mei 1 is a holiday, hence excluded from working days for Basic pay calculation. |
Please rate my answer if helpful. Thank You :)
During the process, there 4.6 there nade on working day Tasha Enterprise produces Keropok Lekor. During...
9.3) Number of hours required per unit is 2 hours and there are 8 working hours per day. There are 20 working days in each month. The number of workers needed to produce 1600 units in a month without overtime and without carrying inventory is: a) 15 b) 20 c) 25 d) 50 e) None of the above
please show work!!!!
Part 2, Instructions: Read the information below and use this to answer question 9-11 on page 8 Section 9. OVERTIME Pursuant to the provisions of the Fair Labor Standards Act, non-exempt employees shall be paid overtime at their appropriate rate of not less than one and one-half(1 %) times their rate of pay for each hour worked in a work period in excess of the maximum hours allowable, which are applicable to the type of employment in...
please showing working.. formulas
10. A company produces sofas. The manager wants to prepare a 0. am for the next six months using the following information: plan Month 2 3 456 160 150 160 180 170 140 recast demand For Cost Per Unit Regular time $100 Overtime $150 Part-time $120 Inventory, per month $10 Back order, per month $50 There are five workers, each making 30 sofas a month. The maximum number of sofas produced during overtime is 30 per...
7. The Cramer Computer Company has the following projected demand for the next 6 months: Month No. of Working days in Month Demand 2.600 3,100 3,700 4,300 3,500 3,300 There are currently 100 workers, each working a normal 8-hour shift, 5 days a week. They can work an extra 10 hours a week in overtime, but it costs the com- pany an extra $10 per hour in overtime costs. One of the computers takes 5 hours of worker time to...
Develop a production schedule to produce the exact production requirements by varying the workforce size for the following problem The monthly forecasts for Product X for January February, and March 1010, 1510 and 1180 respectively. Safety stock policy recommends that half of the forecast for that month be defined as safety stock. There are 22 working days in January, 19 in February, and 21 in March. Beginning inventory is 530 units Manufacturing cost is $180 por unit, storage cost is...
1)Jay Co. is a contract manufacturer that produces two products, Prod A and Prod B; and supply the two products to various retailers. The numbers of units for Prod A and Prod B that Jay Co is contracted to supply for next four months are given in the following table: Month 1 Month 2 Month 3 Month 4 PROD A 1000 4000 1000 3000 PROD B 500 1500 250 1500 The production processes for Prod A and Prod B are...
Problem 8-7 Develop a production plan and calculate the annual cost for a firm whose demand forecast is fall, 10,700; winter, 8,300; spring, 6,900; summer, 12,700. Inventory at the beginning of fall is 535 units. At the beginning of fall you currently have 35 workers, but you plan to hire temporary workers at the beginning of summer and lay them off at the end of summer. In addition, you have negotiated with the union an option to use the regular...
A production process at Kenneth Day Manufacturing is shown in the figure below. The drilling operation occurs separately from, and simultaneously with the sawing and sanding, which are independent sequential operations. A product needs to go through only one of the three assembly operations (the operations are in parallel). Q 2.5 units.hr 1.8 units/hr Assembly a Sawing 0.8 units/hr Sanding Welding 5 units/hr Assembly 0.8 units/hr Driling 5 units.hr Assembly 0.8 units/hr a) Sanding is the bottleneck b) The bottleneck...
The owner of a small mill-working plant that builds cabinets is
developing his aggregate plan for the next year. The relevant cost
data and forecast for the next 4 quarters is provided below. The
company currently has 20 employees and works one 8 hour shift each
day with 2 paid 15 minute breaks. Assume each quarter has 65
working days, and that it currently has no units in stock. Use this
information and the information from the table to answer...
please show working
the
question is complete. 16 a) b)c)d)
approxma 02, supplemented with overtime.) 16. MT makes small camping and snowmobile trailers. The demand for camping trailers occurs between January and June (mostly in April and May). MT makes camping trail- ers from January to June, shuts down in July and then makes snowmobile trailers from August to November. Suppose now is the end of December. For simplicity, we consider every two months as a period. The forecasts for...