Question

DESIGN ELECTRONIC SOLUTION

Question 3. (Marks: 45) Design of the electronic solution using an appropriate tool to construct the activity list/ work package. The electronic solution should include the following tasks: • Project information; • Schedule of the project; • The work pattern (calendar). (Consider eight working hours per day, possible holidays and other non-working days where possible); • Activity duration and possible dependencies; • Milestones; • Predecessors/Gantt chart; • Project summary. Marking Guideline Required Allocation of Marks Setup of the project information. • Set the start date/Finish date (1); • Set applicable calendar (1). 2 Schedule the project as follows: • The project is adequately scheduled (2). 2 Configure the work pattern (calendar). • Adequately created a new calendar (1); • Working times are adequately set (2); • Non-working times are adequately set (2). 5 List activities to be created. • Outstandingly added as per WBS in the project (9-10); • Adequately added as per WBS in the project (6-8); • Partially added as per WBS in the project (3-5); • Inadequately added as per WBS in the project (1-2). 10 18, 19, 20 2020 © The Independent Institute of Education (Pty) Ltd 2020 Page 10 of 11 Required Allocation of Marks Indent and link the activities. • Outstandingly indented as per WBS in the project (4); • Adequately indented as per WBS in the project (3); • Partially indented as per WBS in the project (2); • Inadequately indented as per WBS in the project (1). 4 Determine the activity duration. • Outstandingly added as per WBS in the project (9-10); • Adequately added as per WBS in the project (6-8); • Partially added as per WBS in the project (3-5); • Inadequately added as per WBS in the project (1-2). 10 Determined milestones. • Outstandingly indented as per WBS in the project (4); • Adequately indented as per WBS in the project (3); • Partially indented as per WBS in the project (2); • Inadequately indented as per WBS in the project (1). 4 Configure activity dependencies. • Outstandingly configured in the project (4); • Adequately configured in the project (3); • Partially configured in the project (2); • Inadequately configured in the project (1). 4 Overall: Schedule the activities/predecessors/Gant chart. • Outstandingly scheduled (3); • Adequately scheduled (2); • Partially scheduled (1); • Inadequately schedule (½). 3 The project summary is adequately shown.

0 0
Add a comment Improve this question Transcribed image text
Request Professional Answer

Request Answer!

We need at least 10 more requests to produce the answer.

0 / 10 have requested this problem solution

The more requests, the faster the answer.

Request! (Login Required)


All students who have requested the answer will be notified once they are available.
Know the answer?
Add Answer to:
DESIGN ELECTRONIC SOLUTION
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Similar Homework Help Questions
  • Assignment #2 is to provide a problem statement, WBS diagram, activity listing, and precedence diagram. Deliverables...

    Assignment #2 is to provide a problem statement, WBS diagram, activity listing, and precedence diagram. Deliverables for HW2 shall include: · A Project Statement For the attached example (see item 3 below), the Project Statement is: “Owner to design and build a new residence. Hiring and oversight of architectural, design, and construction professionals will be managed by the Owner. All materials and permits will be provided by the Owner.” · An Activity Listing The activity listing should be prepared and...

  • Operation management

    The following activities are part of a project to be scheduled using CPM.Activity Immediate predecessors Time(Weeks)A - 6B A 3C A 7D C 2E B,D 4F D 3G E,F 7i) Draw the networkii) What is the critical path?iii) How many weeks will it take to complete the project?iv) How much slack does activity B have?

  • Consider the following project where times are in weeks. Activity Duration Immediate Predecessors A B с...

    Consider the following project where times are in weeks. Activity Duration Immediate Predecessors A B с D E F G H A.B B A с E,F 8 12 7 4 2 3 7 3 DF a) Determine the activity schedule (ES, EF, LS, and LF) as well as slack using the information from the table above (11 marks) b) Determine all the possible paths of this project and determine the shortest possible time this project can be completed? (4 marks)...

  • #1. A project in its 26th week has an actual cost of $270,000. It was scheduled...

    #1. A project in its 26th week has an actual cost of $270,000. It was scheduled to have spent $261,000. For the work performed to date, the budgeted value is $272,000. What are the cost and schedule variances for the project? What are the SPI and CPI? What is your assessment of the project from a cost and schedule perspective? #2. A project has just completed the 87th item in its plan. It was scheduled to have spent $168,000 at...

  • Suppose that you are scheduling a room. You are given a group of activities each of...

    Suppose that you are scheduling a room. You are given a group of activities each of which has a start and stop time. Two activities are compatible if they do not overlap (one activity finishes before another one starts). For example, in the following activities, activity A is compatible with activities B and D but not activity C: Activity Start Time Stop time A 1 2 B 2 5 C 1 3 D 5 6 The room has a start...

  • 3- Tables below show activities of a small project, predecessors, duration time, and resources that are...

    3- Tables below show activities of a small project, predecessors, duration time, and resources that are required (machines and workers). There are 3 machines and 4 workers available each day. Please use resource allocation algorithm to optimally allocate the recourses to the activities. Please specifies the project completion time. Table 1: Activities, predecessors and duration time. Activity Predecessor Duration A - 2 B B 2 C A,B 1 D C,D 2 E D 3 Table 2: Activities and their required...

  • Scenario: Your organisation, ABC construction group has made a winning bid to construct a new manufacturing...

    Scenario: Your organisation, ABC construction group has made a winning bid to construct a new manufacturing plant. The client expects the plant to be functional within a year. You are assigned as the Project Manager to ensure that the whole project stays on schedule. The two important conditions as per the client contract are:- ABC construction group will incur a penalty if the work is not completed by the deadline of 47 weeks from now. ABC construction group will be...

  • 3- Tables below show activities of a small project, predecessors, duration time, and resources that are...

    3- Tables below show activities of a small project, predecessors, duration time, and resources that are required (machines and workers). There are 3 machines and 4 workers available each day. Please use resource allocation algorithm to optimally allocate the recourses to the activities. Please specifies the project completion time. Table 1: Activities, predecessors and duration time. Predecessor Duration 2 Activity A B с D 2 1 B AB C.D D 2 E 3 Table 2: Activities and their required number...

  • Project management Zeus Project-A You are Donald Tuck, the project manager in charge of the Zeus...

    Project management Zeus Project-A You are Donald Tuck, the project manager in charge of the Zeus project. Zeus was the code name given to the development of a virtual electronic medical reference guide. Zeus would be designed for emergency medical technicians and paramedics who need a quick reference guide to use in emergency situations, even in offline mode. Donald and his project team were developing a project plan aimed at producing 30 working models in time for InterMedCON 2018, the...

  • . Verizon LTE 1:22 PM 10 77% 3. It is common for activities in projects to...

    . Verizon LTE 1:22 PM 10 77% 3. It is common for activities in projects to run late. What should be DONE when this happens differs between traditional Critical Path Method (CPM) and TOC's Critical Chain Project Management (CCPM). The upper-most of the two diagrams provided below is a typical Critical Path Method (CPM) Gantt PERT Chart schedule. The lower of the two diagrams is a typical Critical Chain Project Management (CCPM) schedule (with resource, feeding and project buffers included)....

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
Active Questions
ADVERTISEMENT