3.1 Answer (a), (b), and (c) 3.1 A batch of parts is produced on a semi-automated...
please answer this i need it asap ill make sure to rate and give thumbs up! 1. A company has five machines (1 lathe, 2 mills and 2 drills) arranged sequentially to produce a batch of 200 parts. The following table lists the setup and work cycle times per piece for the five machines. Delay (hr) 10 10 10 10 10 Work cycle time (min) 15 27 12 Setup time (hr.) 2.50 1.25 1.50 0.50 0.75 Machine 1. Lathe 2....
(b) Compute the cycle time and production rate for a single-machine robotic cell for an 8- hour shift if the system availability is 90%. Also determine the percent utilization of machine and robot. On average, the machine takes 30 s to process part. The other robot operation times as follows: Robot picks up a part from the conveyor 3.0 s Robot moves the part to the machine 1.3 s Robot loads the part onto the machine 1.0 5 Robot unloads...
A company has five machines (1 lathe, 2 mills and 2 drills) arranged sequentially to produce a batch of 200 parts. The following table lists the setup and work cycle times per piece for the five machines. 1. Delay hr) 10 10 10 10 10 Machine Setup time (hr. 2.50 1.25 1.50 0.50 0.75 (min) 15 27 12 1. Lathe 2. Milling (V) 3. Milling (H) 4. Drill (i) 5. Drill (ii) Management wants to procure a multitasking machine to...
Briefly describe How we get the Mean transport value? A semi-automated flexible manufacturing cell (FMC) is used to produce three products The products are made by two automated processing stations followed by an assembly station. There is also a load/unload station. Material handling between stations in the FMC is accomplished by mechanized carts that move tote bins containing the particular components to be processed and then assembled into a given product. The carts transfer tote bins between stations. In this...
Problems 1-10 Now you have another piece of information - Table 1. It was either obtained by measuring times to complete each operation, or based on experience with similar operations. For simplicity, setup and cycle times are assumed the same for both 1 and 10.000 parts. To simplify calculations, and without loss of generality, the following is assumed: - The material cost per one part is assumed to be the same, so we neglect it for comparison purposes - Tool...
Emery Company sells small machine parts to heavy equipment manufacturers for an average price of $4.70 per part. There are two types of customers: those who place small, frequent orders and those who place larger, less frequent orders. Each time an order is placed and processed, a setup is required. Scheduling is also needed to coordinate the many different orders that come in and place demands on the plant's manufacturing resources. Emery also inspects a sample of the products each...
External Linkages, Customer Costing, Customer Profitability Emery Company sells small machine parts to heavy equipment manufacturers for an average price of $1.05 per part. There are two types of customers: those who place small, frequent orders and those who place larger, less frequent orders. Each time an order is placed and processed, a setup is required. Scheduling is also needed to coordinate the many different orders that come in and place demands on the plant's manufacturing resources. Emery also inspects...
109 CASE STUDY Dream Desk Compary Dream Desk Company is a major supplier of office desks for can profit from this market growth if prices can be held in line home and business. The company has been in existence since 1875. Affler serving an apprenticeship as a cabinet maker in the and quick delivery can be promised. Dream Desk operates a 250,000 sq. ft. manufacturing fa- cast, George Dreamer had a violent disagreement with the shop eility in Casa Petite,...
10. Write a one-page summary of the attached paper? INTRODUCTION Many problems can develop in activated sludge operation that adversely affect effluent quality with origins in the engineering, hydraulic and microbiological components of the process. The real "heart" of the activated sludge system is the development and maintenance of a mixed microbial culture (activated sludge) that treats wastewater and which can be managed. One definition of a wastewater treatment plant operator is a "bug farmer", one who controls the aeration...