Anguilla Manufacturing is interested in using the data collected during value stream mapping to evaluate the...

Anguilla Manufacturing is interested in using the data collected during value stream mapping to evaluate the current state of performance of the capacity of its manual assembly line process under different batch size assumptions. The availability of processing per shift, after accounting for breaks and a midshift employee meeting, is 436 minutes. The current operating characteristics of each processing step are found in the accompanying table. Note that each step can only process one part at a time and all steps must process the same sized batches.

Cycle time per part: 20 seconds (saw), 15 seconds (sand), 30 seconds (drill), 25 seconds (assemble), 10 seconds (mark)

setup time per batch: 3 minutes (saw), 4 minutes (sand), 0 minutes (drill), 3 minutes (assemble), 8 minutes (mark)

a) Calculate the average processing time per unit and the capacity at each step assuming batch sizes of: 10 units, 20 units, 30 units, 40 units.

b) Identify the bottleneck oepration and the line's processing capacity for each batch size listed in part (a)

c) explain why batch sizes beyond 40 units will not increase the line's processing capacity further.  

Thanks in advance!

0 0
Add a comment Improve this question Transcribed image text
Answer #1

a) For the given batch sizes, average processing time per unit is computed at each step as below:

D13 a fx LOOKUP(D10,D$3:D$7,$A$3:$A$7) Average processing time per unit for batch size, a 2 Step 3 Saw 4 Sand 5 Drill 6 Assemble 7 Mark Cycle Setup time 180 240 10 30 26.0 23.0 30.0 31.0 26.0 20 time 20 15 30 25 10 38.0 39.0 30.0 43.0 58.0 29.0 27.0 30.0 34.0 34.0 24.5 21.0 30.0 29.5 22.0 180 480 10 Longest processing time- 31 30 12 13 14 15 16 17 18 19 20 Bottleneck step Mark Mark Assemble Drill

EXCEL Formulas:

b) Bottleneck operation is identified in part (a) above.

Processing capacity = 1 / Cycle time, where Cycle time is the average processing time of bottleneck step.

For batch size of 10, processing capacity = (1/58)*60 = 1.034 per minute

For batch size of 20, processing capacity = (1/34)*60 = 1.765 per minute

For batch size of 30, processing capacity = (1/31)*60 = 1.935 per minute

For batch size of 40, processing capacity = (1/30)*60 = 2.000 per minute

c) The average processing time of Drill is constant at 30 sec irrespective of batch size, because it does not have any setup time.

With a batch size of 40 units, the cycle time of 30 second is achieved, which is equal to the average processing time of Drill. So, Drill is the bottleneck step for a batch size of 40 units. So further, increasing the batch size, will not reduce the cycle time of Drill operation, as already elaborated.

Hence, the line's processing capacity will not improve further, despite increasing the batch size beyond 40 units.

Add a comment
Know the answer?
Add Answer to:
Anguilla Manufacturing is interested in using the data collected during value stream mapping to evaluate the...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • 13. manufacturing is interested is in using the data Collected Stream mapping to Curosent state perstormance...

    13. manufacturing is interested is in using the data Collected Stream mapping to Curosent state perstormance of its manual under UUUUUUU Anguilla interested dusing value evaluate the of the Capacity assembly line process different butch Size assumptions. The cuandbility of processing pero shift, after accounting for breaks and a midshift employee meeling is L36 mimutesThe current Opexeting Characterstics of each processing Step Com, only process one pest cat a time and all steps the must process Same Sized betches. 20...

  • Help with question b. please! The manager at Ormonde Inc. collected the value stream mapping data...

    Help with question b. please! The manager at Ormonde Inc. collected the value stream mapping data from the plant's most problematic manufacturing cell that fabricates parts for washing machines. This data is shown in Table 1. Using this data, calculate the current state performance of the cell and answer the following questions. Click the icon to view Table 1. a. What is the cell's current inventory level? The cell's current inventory level is 2050 parts. (Enter your response as a...

  • The manager at FunQ, Inc collected the value stream mapping data from one of t manufacturing...

    The manager at FunQ, Inc collected the value stream mapping data from one of t manufacturing cell. This produces The data is shown in the below table. ll produces a special steel part that is widely used in automotive industries Average demand:180 units/day Batch size: 30 units Number of shifts per day: 1 Availability: 8-hours shift with including two 30 min breaks (60 min break time in total), 7 hours net available time Basic cell information Cycle time 140 sec...

  • Two-step Process Utilization: A two- used to finish a product: painting and drying. There are 5 workers and each one ta...

    Two-step Process Utilization: A two- used to finish a product: painting and drying. There are 5 workers and each one takes an average of 60 minutes to paint each unit. Drying takes place in an oven that can hold up to 100 units and it takes 5 minutes to load each unit. Once all the units are loaded into the oven, it takes 6 hours to dry each load. Assume that the process is capacity constrained (so the demand rate...

  • Williams Optical Inc. is considering a new lean product cell. The present manufacturing approach produces a...

    Williams Optical Inc. is considering a new lean product cell. The present manufacturing approach produces a product in four separate steps. The production batch sizes are 64 units. The process time for each step is as follows: Process Step 1 7 minutes Process Step 2 5 minutes Process Step 3 4 minutes Process Step 4 9 minutes The time required to move each batch between steps is 14 minutes. In addition, the time to move raw materials to Process Step...

  • Williams Optical Inc. is considering a new lean product cell. The present manufacturing approach produces a...

    Williams Optical Inc. is considering a new lean product cell. The present manufacturing approach produces a product in four separate steps. The production batch sizes are 61 units. The process time for each step is as follows: Process Step 1 6 minutes Process Step 2 8 minutes Process Step 3 5 minutes Process Step 4 4 minutes The time required to move each batch between steps is 15 minutes. In addition, the time to move raw materials to Process Step...

  • Compute Lead Time Williams Optical Inc. is considering a new lean product cell. The present manufacturing...

    Compute Lead Time Williams Optical Inc. is considering a new lean product cell. The present manufacturing approach produces a product in four separate steps. The production batch sizes are 45 units. The process time for each step is as follows: Process Step 1 5 minutes Process Step 2 8 minutes Process Step 3 4 minutes Process Step 4 3 minutes The time required to move each batch between steps is 5 minutes. In addition, the time to move raw materials...

  • Williams Optical Inc. is considering a new lean product cell. The present manufacturing approach produces a product in f...

    Williams Optical Inc. is considering a new lean product cell. The present manufacturing approach produces a product in four separate steps. The production batch sizes are 45 units. The process time for each step is as follows: Process Step 1 5 minutes Process Step 2 8 minutes Process Step 3 4 minutes Process Step 4 3 minutes The time required to move each batch between steps is 5 minutes. In addition, the time to move raw materials to Process Step...

  • 2. Consider the following batch flow process consisting of three process steps performed by three machines: Step 1 Step...

    2. Consider the following batch flow process consisting of three process steps performed by three machines: Step 1 Step 3 Step 2 Processing time 1 minute/part Processing time 1.5 minute/part Processing time 2 minute/part Setup time No Setup No Setup 20 minutes Work is processed in batch at each step. Before a batch is processed at step 1, the machine has to be set up. During There are no inventory buffers between steps. a setup, the machine is unable to...

  • The Yum and Yee food truck near the business school serves customers during lunch hour by...

    The Yum and Yee food truck near the business school serves customers during lunch hour by taking orders and making fresh batches of stir-fry. Customers have only one choice during the lunch hour so that Y&Y can maximize the number of customers served. Assume that each customer places just one lunch order, and all lunch orders are the same size: one unit of stir-fry. The stir-fry cooking works in this manner. First, one person cooks a batch of orders in...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT