Problem 4-21 (Algorithmic) Greenville Cabinets received a contract to produce speaker cabinets for a major speaker manufactur

0 0
Add a comment Improve this question Transcribed image text
Answer #1

B1R = Quantity of bookshelf speakers produced using regular time labor in month 1.

B2R = Quantity of bookshelf speakers produced using regular time labor in month2.

F1R = Quantity of floor speakers produced using regular time labor in month 1.

F2R = Quantity of floor speakers produced using regular time labor in month 2.

B1O = Quantity of bookshelf speakers produced using overtime labor in month 1.

B2O = Quantity of bookshelf speakers produced using overtime labor in month 2.

F1O = Quantity of floor speakers produced using overtime labor in month 1.

F2O = Quantity of floor speakers produced using overtime labor in month 2.

IB = Month 1 ending inventory for bookshelf speakers.

IF = Month 1 ending inventory for floor speakers.    

The Decision Variables are B1R, B2R, F1R, F2R, ………….. IF, whose production and storage costs have to be minimized.

Table for Labor Costs per Unit:

Model

Regular (in $)

Overtime (in $)

Bookshelf speakers

0.8 x 25 = 20

0.8 x 36 = 28.8

Floor speakers

1 x 25 = 25

1 x 36 = 36

The Objective Function is:

Minimize Z = 20 B1R + 20 B2R + 25 F1R + 25 F2R + 28.8 B1O + 28.8 B20 + 36 F1O + 36 F2O + 13 B1R + 13 B2R + 15 F1R + 15 F2R + 13 B1O + 13 B20 + 15 F1O + 15 F2O + 8 IB + 8 IF.

Or,

Minimize Z = 33 B1R + 33 B2R + 40 F1R + 40 F2R + 41.8 B1O + 41.8 B20 + 51 F1O + 51 F2O + 8 IB + 8 IF.

Constraints:

Regular Time Production - Month 1:-   0.8 B1R + 1 F1R  \leq 2,700 hours.

Regular Time Production - Month 2:-   0.8 B2R + 1 F2R  \leq 2,700 hours.

Overtime Production - Month 1:-   0.8 B1O + 1 F1O  \leq 1,300 hours.

Overtime Production - Month 2:-   0.8 B2O + 1 F2O  \leq 1,300 hours.

Bookshelf Speaker Production - Month 1:-   1 B1R + 1 B1O – 1 IB = 2,400 units.

Bookshelf Speaker Production - Month 2:-   1 IB + 1 B2R + 1 B2O = 1,500 units.

Floor Speaker Production - Month 1:-   1 F1R + 1 F1O – 1 IF = 1,800 units.

Floor Speaker Production - Month 2:-   1 IF+ 1 F2R + 1 F2O = 2,900 units.

B1R, B2R, F1R, F2R, ………….. IF \geq 0 (Non-negativity constraints)

Optimal Solution:

Model

Regular Time Manufacture

Month 1

Month 2

Bookshelf speakers

2,400

1,500

Floor speakers

780

1,500

Model

Overtime Manufacture

Month 1

Month 2

Bookshelf speakers

0

0

Floor speakers

1,120

1,300

C D. G L M N H Greenville Cabinets Problem Variables IB 3. B1R F1R F2R B10 F10 Total Cost B2R B20 F20 IF 780 0 2400 1500 1500

Add a comment
Know the answer?
Add Answer to:
Problem 4-21 (Algorithmic) Greenville Cabinets received a contract to produce speaker cabinets for a major speaker manu...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • Problem 4-21 (Algorithmic) Greenville Cabinets received a contract to produce speaker cabinets for a major speaker...

    Problem 4-21 (Algorithmic) Greenville Cabinets received a contract to produce speaker cabinets for a major speaker manufacturer. The contract calls for the production of 5,300 bookshelf speakers and 6,100 floor speakers over the next two months, with the following delivery schedule: Model Month 1 Month 2 Bookshelf 3,100 2,200 Floor 2,500 3,600 Greenville estimates that the production time for each bookshelf model is 0.6 hour and the production time for each floor model is 1 hour. The raw material costs...

  • Problem 3-25 Georgia Cabinets manufactures kitchen cabinets that are sold to local dealers throughout the Southeast....

    Problem 3-25 Georgia Cabinets manufactures kitchen cabinets that are sold to local dealers throughout the Southeast. Because of a large backlog of orders for oak and cherry cabinets, the company decided to contract with three smaller cabinetmakers to do the final finishing operation. For the three cabinetmakers, the number of hours required to complete all the oak cabinets, the number of hours required to complete all the cherry cabinets, the number of hours available for the final finishing operation, and...

  • O/ Write an appropriate mathematical model for this problem including Decision Variables and their description, Objective...

    O/ Write an appropriate mathematical model for this problem including Decision Variables and their description, Objective Function, & Constraints. XAMPLE 4.3 AGGREGATE PLANNING AT SURESTEP uring the next four months the SureStep Company must meet (on time) the fol lowing demands for pairs of shoes: 3000 in month 1 5000 in month 2; 2000 in month 3; and 1000 in month 4. At the beginning of month 1, 500 pairs of shoes are on hand, and SureStep has 100 workers....

  • Here is an operations planning case analysis. You are expected to do the following questions and...

    Here is an operations planning case analysis. You are expected to do the following questions and submit them for marking at the end of the semester via utsonline and in hard copy to your tutor in week 10. A company has the following demand forecast next year, expressed in six bimonthly periods: Forecast Demand: Period 1 = 4,500 units Period 4 = 6,500 units Period 2 = 3,000 units Period 5 = 5,100 units Period 3 = 4,800 units Period...

  • Problem 2-53 (Algorithmic) Management of High Tech Services (HTS) would like to develop a model that...

    Problem 2-53 (Algorithmic) Management of High Tech Services (HTS) would like to develop a model that will help allocate its technicians' time between service calls to regular contract customers and new customers. A maximum of 90 hours of technician time is available over the two-week planning period. To satisfy cash flow requirements, at least $950 in revenue (per technician) must be generated during the two-week period. Technician time for regular customers generates $40 per hour. However, technician time for new...

  • Medisan Inc. has just signed a contract to supply walky-talkiesto the Turkish Armed Forces. Durin...

    Medisan Inc. has just signed a contract to supply walky-talkiesto the Turkish Armed Forces. During the next four months, the firm must deliver 150 in December, 160 in January, 225 in February and 180 in March. Medisan’s factory in Temelli can produce walky-talkies at a cost of $20 per unit (labor cost is not included). To produce a walky-talky 10 hours of labor are required and there are 10 workers available at the plant at the beginning of December. Each...

  • Problem 4-19 (Algorithmic) The Silver Star Bicycle Company will be manufacturing both men’s and women’s models...

    Problem 4-19 (Algorithmic) The Silver Star Bicycle Company will be manufacturing both men’s and women’s models of its Easy-Pedal 10-speed bicycles during the next two months. Management wants to develop a production schedule indicating how many bicycles of each model should be produced in each month. Current demand forecasts call for 150 men’s and 125 women’s models to be shipped during the first month and 220 men’s and 170 women’s models to be shipped during the second month. Additional data...

  • Problem 8-7 Develop a production plan and calculate the annual cost for a firm whose demand...

    Problem 8-7 Develop a production plan and calculate the annual cost for a firm whose demand forecast is fall, 10,700; winter, 8,300; spring, 6,900; summer, 12,700. Inventory at the beginning of fall is 535 units. At the beginning of fall you currently have 35 workers, but you plan to hire temporary workers at the beginning of summer and lay them off at the end of summer. In addition, you have negotiated with the union an option to use the regular...

  • 1)Jay Co. is a contract manufacturer that produces two products, Prod A and Prod B; and...

    1)Jay Co. is a contract manufacturer that produces two products, Prod A and Prod B; and supply the two products to various retailers. The numbers of units for Prod A and Prod B that Jay Co is contracted to supply for next four months are given in the following table: Month 1 Month 2 Month 3 Month 4 PROD A 1000 4000 1000 3000 PROD B 500 1500 250 1500 The production processes for Prod A and Prod B are...

  • Problem 1 (Aggregate planning): Martin Trailers (MT) is a manufacturer of small camping and snowmobile trailers...

    Problem 1 (Aggregate planning): Martin Trailers (MT) is a manufacturer of small camping and snowmobile trailers in Ontario (lvey case #9A82D006). The demand for the camping trailers occurs between Jan and Jun of each year (mostly in Apr and May). Aggregate demand (in units) is: Jan 450 Feb 525 Mar 675 Apr 1005 May 1,125 Jun. 600 MT employs 40 permanent workers who are paid $20 per hour and each worker works 150 hours per month. Together they make approx....

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT