Question

Operations Management Question

CAN YOU PLEASE HELP ME?

The Action Toy Company has decided to manufacture a new train set, the production of which is broken into six steps. 

The demand for the train is 4,800 units per 40-hour workweek:



Ekran Görüntüsü (1).png


Questions;

1) Draw a precedence diagram of this operation.

2) In Question 1, given the demand, what is the cycle time for this operation? 

Write the formula, and show your calculations.

3) For Question 1, what is the theoretical minimum number of workstations? 

Write the formula, and show your calculations.

4) For, Question 1, assign tasks to workstations. 

5)  For Question 1, how much total idle time is present each cycle? 

Show your calculation.

6) For Question 1, what is the efficiency of the assembly line with five stations? With six stations?

Write the formula, and show your calculations.


0 0
Add a comment Improve this question Transcribed image text
Answer #1

The 24 consonant sounds comprise six stops (plosives): p, b, t, d, k, g; the fricatives f, v, θ (as in thin), ð [eth] (as in then), s, z, [esh] (as in ship), Ʒ (as in pleasure), and h; two affricatives: t∫ (as in church) and dƷ (as the j in jam); the nasals m, n, ŋ (the sound that occurs at the end of words such as young); the lateral l; the postalveolar or retroflex r; and the semivowels j (often spelled y) and w. These remain fairly stable, but Inland Northern American differs from RP in two respects: (1) r following vowels is preserved in words such as door, flower, and harmony, whereas it is lost in RP; (2) t between vowels is voiced, so that metal and matter sound very much like British medal and madder, although the pronunciation of this t is softer and less aspirated, or breathy, than the d of British English.

answered by: Gamesome Goshawk
Add a comment
Know the answer?
Add Answer to:
Operations Management Question
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • I need help with the total idle time per cycle question, please include steps with explanations...

    I need help with the total idle time per cycle question, please include steps with explanations & Problem 9.15 The Action Toy Company has decided to manufacture a new train set, the production of which is broken into six steps. T Question Help he demand for the train is 4,800 units p 40-hour workweek Performance Time Task Predecessors 20 27 B, C D.E 12 This exeroise only contains parts b, c, d, e, and f b) Given the demand, the...

  • The Action Toy Company has decided to manufacture a new toy tractor, the production of which...

    The Action Toy Company has decided to manufacture a new toy tractor, the production of which is broken into six steps. The demand for the tractor is 4,800 units per 40-hour workweek. TASK, PERFORMANCE TIME(SECONDS), PREDECESSORS A 20 None B 30 A C 15 A D 15 A E 10 B,C F 30 D,E A) Draw a precedence diagram B) What is the cycle time? C) What is the theoretical minimum number of workstations? D) Assign tasks to workstations E)...

  • Layout Strategies Homework The Action Toy Company has decided to manufacture a new train set, the...

    Layout Strategies Homework The Action Toy Company has decided to manufacture a new train set, the production of which is broken into six steps describe in the table below. The demand for the train is 4,800 units per 40 hour workweek. PLEASE ANSWER ALL QUESTIONS ONE BY ONE. Task Performance Time (second) Predecessors 20 А 15 15 DE 30 120 a) Draw a precedence diagram of this operation. b) Given the demand, what is the cycle time for this operation?...

  • Hello, I need to see the solution, how they got these numbers? Will appreciate help. The...

    Hello, I need to see the solution, how they got these numbers? Will appreciate help. The Action Toy Company has decided to manufacture a new train set, the production of which is broken into six steps. The demand for the train is 4,600 units per 40-hour workweek: Predecessors Task A B С D E F Performance Time (seconds) 22 27 14 15 10 28 А A А B, C DE This exercise only contains parts b, c, d, e, and...

  • 1. [Layout Strategy-Line Balancing] The call center department of Jax-steel company needs to service 3,000 calls...

    1. [Layout Strategy-Line Balancing] The call center department of Jax-steel company needs to service 3,000 calls per 40-hour workweek. The process of servicing calls can be broken down into the six stations listed above. The precedence and time requirements for each element are as follows in the table below. The manager wants a new operational analyst to draw and label a precedence diagram for the service process. Finally, the manager needs to balance the line, calculate the efficiency of the...

  • 3. Illinois Furniture, Inc., produces all types of office furniture. The "Executive Secretary” is a chair...

    3. Illinois Furniture, Inc., produces all types of office furniture. The "Executive Secretary” is a chair that has been designed using ergonomics to provide comfort during long work hours. The chair sells for $130. There are 480 minutes available during the day, and the average daily demand has been 48 chairs. the eight tasks required to produce the chair and the precedence diagram are shown below TASK PERFORMANCE TIME (min) ULUI Precedence diagram a. What is the cycle time for...

  • e As part of a major plant renovation project, the industrial engineering department has been asked...

    e As part of a major plant renovation project, the industrial engineering department has been asked to balance an assembly operation. Assume full 8 hours are available per day. Precedence relationships and tasks times are shown below. If daily demand is 285 units of output, there needs to be workstations to meet the demand. The answer is an integer Task Time (minutes) Cycle time (c) Theoretical minimum number of stations (TM) = Idle time = nc - Et Efficiency (%)...

  • ... 9.13 Illinois Furniture, Inc., produces all types of office furniture. The "Executive Secretary” is a...

    ... 9.13 Illinois Furniture, Inc., produces all types of office furniture. The "Executive Secretary” is a chair that has been designed using ergonomics to provide comfort during long work hours. The chair sells for $130. There are 480 minutes available during the day, and the average daily demand has been 50 chairs. There are eight tasks: TASK PERFORMANCE TIME (min) TASK MUST FOLLOW TASK LISTED BELOW A,B F, G a) Draw a precedence diagram of this operation. b) What is...

  • ... 9.12 South Carolina Furniture, Inc., produces all types of office furniture. The "Executive Secretary" is...

    ... 9.12 South Carolina Furniture, Inc., produces all types of office furniture. The "Executive Secretary" is a chair that has been designed using ergonomics to provide comfort during long work hours. The chair sells for $130. There are 480 minutes available dur- ing the day, and the average daily demand has been 50 chairs. There are eight tasks: Task Must Follow Task Listed Below Performance Time Task (min) A4 B 7 C 6 AB E F,G a) Draw a precedence...

  • 3. A manager wants to assign tasks to workstations in order to achieve an hourly output...

    3. A manager wants to assign tasks to workstations in order to achieve an hourly output rate of four units. The depart- working time of 56 minutes per hour. ment uses a Assign the tasks shown in the following precedence network (times are on the nodes and are in minutes) to workstations using the following heuristic rules: (i) Assign the task with the largest positional weight. (ii) Tiebreaker: "Assign the task with the longest time." If a tie still exists,...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT